搜索结果: 1-12 共查到“土木建筑工程 site”相关记录12条 . 查询时间(0.031 秒)
3D AND 4D MODELLING IN BUILDING SITE WORKING CONTROL
building site historic center safety 4D management
2019/3/2
The purpose of this contribution is to describe the use of the HBIM method for the management of the restoration building site applied to a historic building in the heart of the historic center of L'A...
Estimating inelastic sediment deformation from local site response simulations
Coseismic sediment deformation Local site response Plasticity Seismicity Strong ground motion
2015/7/1
Significant insight into the dynamic local site response of a horizontally layered sediment deposit to seismic excitation can be gained from numerical simulations. In this paper we use a nonlinear loc...
Application of the Combined Method for Evaluating the Compressive Strength of Concrete on Site
Nondestructive Testing Rebound Hammer Ultrasonic Pulse Velocity Combined Method Compressive Strength Specimen Samples Cores Regression Analysis
2013/1/31
Ultrasonic pulse velocity (UPV) and rebound hammer (RH) tests are often used for assessing the quality of concrete and estimation of its compressive strength. Several parameters influence this propert...
Improving performance and the reliability of off-site pre-cast concrete production operations using simulation optimisation
Construction Supply Chain Multi-Layered Genetic Algorithms Simulation Modelling Crew Allocation System Precast Industry
2010/9/29
The objective is to improve off-site pre-cast production operations using Multi-Layered Genetic Algorithms. The Multi-Layered concept emerged in response to the modelling requirements of different se...
Towards minimizing space-time conflicts between site activities using simple generic algorithm – the best execution strategy
4D product assembly genetic algorithm execution pattern space planning constraints
2010/9/29
Construction planners on every project are faced with a unique task of spatially organizing site activities with effective space utilization. This is a crucial planning exercise that if effectively re...
MONTE CARLO ANALYSIS FOR PREDICTION OF NOISE FROM A CONSTRUCTION SITE
Noise, Prediction Construction Stochastic
2010/9/28
The large number of operations involving noisy machinery associated with construction site activities result in considerable variation in the noise levels experienced at receiver locations. This paper...
Consideration of subsurface layer to evaluate site amplification effect in the response and limit strength calculation design method, the building standard law
building standard law enforcement order notification subsurface layer site amplification effect
2009/3/4
Buildings in Japan must be designed and constructed according to Building Standard Law, the Enforcement Order and the Notification by Ministry of Construction and the Ministry of Land, Infrastructure ...
This paper describes an investigation into the potential seismic site response effects for the ground conditions in Hong Kong. A site classification map for the Hong Kong region has been produced usin...
Aspects Regarding the Degradation of a Retaining Wall With the Destination to Reinforce the Stability of the Site Arrangement of Residential Buildings
Retaining wall Stability Degradation Cracks Linear Shifts Angular Shifts
2010/8/18
Performing the diggings nearby and/under the implantation quota of some existing buildings may trigger on the structural elements and/or over the arrangement site states of efforts or additional defor...
Long-distance wireless networking for site – office data communications
local area networks data communication network design data collection remote sensing
2010/9/28
Effective data communications between the project site and decision making office can be critical for the success of a construction project. It allows convenient access to centrally stored information...
The virtual construction site (VIRCON) tools: An industrial evaluation
visualisation 4D modelling space planning user evaluation
2010/9/28
Visual 4D planning and scheduling techniques, that integrate 3D CAD models with the timing of construction activities, have proven to be more beneficial than traditional tools and are increasingly bei...
Effective control of unanticipated on-site events: A pragmatic, human-oriented problem solving approach
mobile computing problem solving construction site rapid communication
2010/9/28
Unanticipated events on building sites are inevitable. The frequency of unanticipated events is usually high due to the inherent complexity and dynamics of construction projects. A proper mobile inter...