搜索结果: 1-6 共查到“工学 construction site”相关记录6条 . 查询时间(0.477 秒)
IMAGE RECORDING CHALLENGES FOR PHOTOGRAMMETRIC CONSTRUCTION SITE MONITORING
Image Recordings Recording Challenges Construction Site Monitoring Photogrammetry Construction
2019/3/4
Construction site monitoring and progress monitoring is becoming increasingly popular in the architecture, engineering and construction (AEC) industry. To this end remote sensing techniques are used t...
TOWARDS RECONSTRUCTING A DORIC COLUMN IN A VIRTUAL CONSTRUCTION SITE
Doric order Doric column architectural member 3D reconstruction point clouds comparison ICP algorithm
2017/4/5
This paper deals with the 3D reconstruction of ancient Greek architectural members, especially with the element of the Doric column. The case study for this project is the Choragic monument of Nicias ...
EVALUATION OF ACQUISITION STRATEGIES FOR IMAGE-BASED CONSTRUCTION SITE MONITORING
photogrammetric point cloud construction site monitoring 3D building model BIM
2016/11/11
Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the a...
CLASSIFICATION OF PHOTOGRAMMETRIC POINT CLOUDS OF SCAFFOLDS FOR CONSTRUCTION SITE MONITORING USING SUBSPACE CLUSTERING AND PCA
Scaffolding components Photogrammetric point clouds Subspace clustering PCA Classification
2016/7/28
This paper presents an approach for the classification of photogrammetric point clouds of scaffolding components in a construction site, aiming at making a preparation for the automatic monitoring of ...
MONTE CARLO ANALYSIS FOR PREDICTION OF NOISE FROM A CONSTRUCTION SITE
Noise, Prediction Construction Stochastic
2010/9/28
The large number of operations involving noisy machinery associated with construction site activities result in considerable variation in the noise levels experienced at receiver locations. This paper...
The virtual construction site (VIRCON) tools: An industrial evaluation
visualisation 4D modelling space planning user evaluation
2010/9/28
Visual 4D planning and scheduling techniques, that integrate 3D CAD models with the timing of construction activities, have proven to be more beneficial than traditional tools and are increasingly bei...