搜索结果: 1-4 共查到“水利学特色库 After Lining”相关记录4条 . 查询时间(0.078 秒)
Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas - 2011 Ratings and Analysis
Evaluation Canal Lining Projects Lower Rio Grande Valley of Texas Ratings Analysis
2013/9/10
Since 1999, nine (9) irrigation districts in the Hidalgo, Cameron, Willacy and Maverick Counties have installed nine (9) different types of synthetic canal lining materials, totaling approximately 26 ...
Water Loss Test Results for Lateral A Before and After Lining Hidalgo County Irrigation District No. 2
Water Loss Test Results Lateral A Before After Lining Hidalgo County Irrigation District No. 2
2013/9/10
Water Loss Test Results for Lateral A Before and After Lining Hidalgo County Irrigation District No. 2.
Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) - Lining Main Canal - Final
Economic Conservation Evaluation Capital Renovation Projects Maverick County Water Control Improvement District No. 1 Lining Main Canal Final
2013/9/10
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement Distri...
Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) - Lining Main Canal - Preliminary
Economic Conservation Evaluation of Capital Renovation Projects Maverick County Water Control Improvement District No. 1 Lining Main Canal Preliminary
2013/9/10
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement Distri...